When we 1st reach there, only this side of structures was complete...
Without the paint's colour la...
Painting job mostly tat done it all...^^
Above are some pics for 1st floor of the whole building...there are 2nd floor up next~


Man, not a normal Malay...he seems like knows a lot, lots of things :
Welding, climbing, hanging, fixing pipe, connect electricity, painting, settings wall, great strength...etc~


Big wall...the most difficult wall to set...due to it height around 7 metres tall
Luckily got Man...
This two big walls set at both wall at the stairs case...looks extreme for me when climb high high then look down^^
2nd Floor


Man, not a normal Malay...he seems like knows a lot, lots of things :
Welding, climbing, hanging, fixing pipe, connect electricity, painting, settings wall, great strength...etc~

Big wall...the most difficult wall to set...due to it height around 7 metres tall
Luckily got Man...
This two big walls set at both wall at the stairs case...looks extreme for me when climb high high then look down^^
2nd Floor












1 comment:
lol...
his hand pain sia...
Post a Comment