Working Experiences

Recently, me and tat went kl to work...as workers in settings indoor climbing wall...





When we 1st reach there, only this side of structures was complete...
Without the paint's colour la...



Painting job mostly tat done it all...^^

Above are some pics for 1st floor of the whole building...there are 2nd floor up next~






Man, not a normal Malay...he seems like knows a lot, lots of things :
Welding, climbing, hanging, fixing pipe, connect electricity, painting, settings wall, great strength...etc~






Big wall...the most difficult wall to set...due to it height around 7 metres tall
Luckily got Man...


This two big walls set at both wall at the stairs case...looks extreme for me when climb high high then look down^^

2nd Floor























Tat's finger black-green~




Machine i always use to cut metal~